Example
Missouri rules for repair of grade 3 pipeline leaks
Maine is among a minority of states that have passed required timelines for repairing even pipeline leaks deemed “nonhazardous” (Grade 3). Missouri requires that pipeline operators repair Grade 3 leaks within 60 months.
Documents
- Existing LawsView
Missouri 20 CSR 4240-40.030(14)(C)(3)