Example
Kansas rules for repair of grade 3 pipeline leaks
Kansas is among a minority of states that have passed required timelines for repairing even pipeline leaks deemed “nonhazardous” (Grade 3). Kansas requires Grade 3 leaks to be repaired within 30 months.
Documents
- Existing LawsView
Kan. Admin. Regs. §82-11-4(bb)