Example
Arizona rules for repair of grade 3 pipeline leaks
Arizona is among a minority of states that have passed required timelines for repairing even pipeline leaks deemed “nonhazardous” (Grade 3). Arizona requires that pipeline operators repair underground, Grade 3 leaks from transmission pipelines within 12 months.
Documents
- Existing LawsView
Ariz. Admin Code §14-5-202(r)