Example
Maine rules for repair of grade 3 pipeline leaks
Maine is among a minority of states that have passed required timelines for repairing even pipeline leaks deemed “nonhazardous” (Grade 3). Maine requires that pipeline operators repair Grade 3 leaks within 24 months.
Documents
- Existing LawsView
Code Maine Regs 65-407 Chapter 420 §6(e)(4)(c)