Oakland EV Charging Ordinance

In December 2016, the City of Oakland passed Ordinance 13408, which was designed to accelerate the installation of vehicle chargers to meet demand. Builders in Oakland are now required to provide at least 2 full-circuit chargers in all parking lots less than 20 spaces, and in 10% of parking spaces in lots over 20 spaces.

Documents

  • Existing Laws

    Ordinance 13408

    Download
  • Existing Laws

    Electric Vehicle Infrastructure Requirements for New Multi-Family and Nonresidential Buildings

    Download