Skip to main content
Example

X-Cel Energy’s Time-of-Use Pilot

Minnesota’s PUC approved a time-of-use pilot program proposed by X-Cel Energy expected to drive greater use of renewables and reduce peak demand. The two-year, 17,500-customer plan is intended to use three price tiers and drive more off-peak use of Minnesota wind.

Documents

  • Existing Examples

    RESIDENTIAL TIME OF USE RATE DESIGN PILOT PROGRAM, DOCKET NO. E002/M-17-775

    Download
  • Existing Laws

    ORDER APPROVING PILOT PROGRAM, SETTING REPORTING REQUIREMENTS, AND DENYING CERTIFICATION REQUEST

    Download