MISO/PJM Joint Modeling Case Study: Clean Power Analysis

MISO and PJM, two independent system operators, produced a 2017 study on compliance with the Obama Administration’s Clean Power Plan, which concluded, among other things, that interstate trading lowered the cost of compliance over in-state compliance only.